Test 1
Election Results
Commissioners 2 and 3 resigned in August and September of 2021. The Commissioner 1 position was vacant since the end of 2019. The County filled the Commissioner 1, 2 and 3 positions with appointments between August and October to serve as interim Commissioner until the February 8, 2022 Election. The week of December 13-17, 2021 was the Candidate Filing Period for the February 2022 Special District General Election. Three positions were open: Position No. 1 for the remaining four years of a term ending February 2026; Position No.2 for the remaining two years of a term ending Feb-2024, Position No. 3 for a term of six years, ending Feb-2028. The interim Commissioners – Gary Rygmyr, Commissioner 1, Dean Cole, Commissioner 2 and Michael Nilssen, Commissioner 3 all filed papers to run for the February 8, 2022 Election. All three candidates were unopposed, therefore per RCW 85.38.115, no election was held and the single candidate for each position was considered to have been elected to the position.
test 2
- December 8, 2022 #0300 agenda
- November 10, 2022 #0299 agenda– Watch the Zoom Recording Passcode: Y7&4C^YR
- October 20, 2022 #0298 agenda– minutes – Watch the Zoom Recording Passcode: UydKBP$9
- October 13, 2022 #0297 agenda– minutes – Watch the Zoom Recording Passcode: Z7akVV!9
- September 22, 2022 #0296 agenda– minutes – Watch the Zoom Recording Passcode: k5ymVQt^
- August 11, 2022 #0295 agenda– minutes – Watch the Zoom Recording Passcode: bKkJj2a*
- August 4, 2022 #0294 agenda– minutes – #1 Zoom Recording Passcode: qa5#q9a# #2 Zoom Recording Passcode: 8o&#N$4Z
- July 14, 2022 #0293 agenda– minutes – Watch the Zoom Recording Passcode: d.mLGTy1
- June 9, 2022 #0292 agenda – minutes – Watch the Zoom Recording Passcode: &cfGH2@=
- May 12, 2022 #0291 agenda – minutes – Watch the Zoom Recording Passcode: 2^z6qHB=
- April 14, 2022 #0290 agenda – minutes – Watch the Zoom Recording Passcode: 2^z6qHB=
- March 10, 2022 #0289 agenda – minutes – Watch the Zoom Recording Passcode: f@mC3&6B
- March 3, 2022 #W2022-01 agenda – minutes – Watch the Zoom Recording Passcode: 4@A4V^MZ
- February 17, 2022 #0288 agenda – minutes– Watch the Zoom meetingPasscode: G2wX$2f=
- January 20, 2022 #0287 agenda – minutes– Recording unavailable due to technical difficulty
test 3
Completion Date: 2003
Construction Cost: $12,000
Surface drainage from Oak Bay Road discharged through the North Bay Condos No. 2 and caused flooding in the driveway, parking lot and outside two of the condominium buildings. A closed pipe connection between the existing culvert on Oak Bay Road and the downstream culvert between the buildings was installed. More Info